中文制服丝袜中出,亚洲无人区在线观看AV,啊轻点灬大JI巴太粗太长N毛片,美女高潮抽搐潮喷白浆视频,2018天天弄国产大片,久久99久久99国产精品免观看

0421-3726633
News
Tel:
Fax:0421-3726633

The release date:2017-06-12 Author:The station Subordinate to the column:Company news

Inner Mongolia commission by letter before the foreign issued "the Inner Mongolia Autonomous Region coal industry restructuring and development action plan (2017 -2020)" Notice of the proposed reconstruction of the coal industry the development of new advantages.

"Plan" put forward, by 2020, the number of coal mines in Inner Mongolia control in less than 550, production capacity of 13 tons or so, safety and efficient production capacity accounting for 90%. By 2020, the region's coal, coal, coal, smelting and smelting integration ratio reached more than 85%, coal conversion rate of 50% in situ. Put an end to major safety accidents, control major accidents and reduce accidents. The mortality rate of coal million tons is controlled within 0.02.

At the same time, the comprehensive utilization of resources and protection of the environment, building materials, power generation using coal gangue increased year by year, 2020, the new coal gangue utilization rate reached more than 40%, the rest of all underground backfill and reclamation, the ground is no longer the formation of new permanent coal gangue, coal gangue all historical standards of governance. The rate of reclaimed green land of open pit mine is more than 90%, and the control rate of coal mining subsidence area is more than 80%, and the ecological environment of mining area has a benign succession.

It is reported that Inner Mongolia has 589 coal mines, with a capacity of 13 tons. "13th Five-Year" period, plans to withdraw from the production capacity of 54 million 140 thousand tons.

The tenth Congress of Inner Mongolia proposed that the development of the coal industry should adhere to the "three bottom line"". Adhere to the bottom line of development, that is, to continue to exert their advantages, stability control capacity, the development of coal, coal, coal, smelting and integration of industrial chain, and promote the transformation of value-added coal in situ. Adhere to the ecological bottom line, that is, to pay close attention to coal mining development caused by disaster management and environmental protection short board, the establishment of long-term working mechanism and policy system. Adhere to the bottom line of the livelihood of the people, that is, to establish coal mining development interests compensation and sharing mechanism, and effectively protect the legitimate interests of farmers and herdsmen in mining areas.

"Plan" proposed to speed up the construction of coal conversion project, strictly control the delivery of coal resources, strict control of new coal production capacity, and guide an annual output of 600 thousand tons of coal orderly withdrawal. By 2020, the region's standardization of coal mine safety production reached a target rate of 70%. To the construction of coal, coal, coal and metallurgical industry chain integration as the core, to promote coal enterprises reorganization, the owners of the competitive selection conditions set new transformation project, which will be the new priority conversion project configuration to the existing coal mine enterprises, the configuration of existing coal mine enterprise reorganization to. We should establish and improve a comprehensive working system and mechanism for the geological environment of coal mines. At the same time in Xilinguole Meng, Hulun Buir City, the autonomous region has agreed to choose 1 local government holding 30%, fulfill the coal resource allocation procedures according to the requirements of the development of coal, to improve production and living conditions of mining area, the accumulation of local government ownership share resource development bonus experience. In line with the state and autonomous regions coal gangue comprehensive utilization and recycling of resources policy, timely cash tax preferential policies.

Chaoyang SAN strong machinery manufacturing co., LTD
Address: north three dragons in chaoyang city telephone: Mr. Li
COPYRIGHT ? 2015 CYSQJX.COM ALL RIGHT RESERVED.
Tech support: inscription that network